2016
St. Vincent Jewelry Center
Los Angeles, CA
We were on site at St. Vincent Jewelry Center in Los Angeles, California to perform this cooling tower replacement. Photographs show crane day, removing all the old equipment from the roof, and setting all the new equipment on the existing sub frame, as well as lifting all the prefab and parts needed to install it. The entire system was fabricated in our yard so once we set it in place, it required only two field welds.